Data Pipeline Runs
Learn how to view, filter, analyze, and cancel data pipeline runs.
Overview
The Data Pipeline runs page lists pipeline runs with their status and outcome. From it you can refresh individual runs, open a detailed analysis, and cancel runs that are still in progress.
In the sidebar, select Data > Data Pipeline Runs. The list is sorted by start time, newest first, and loads 20 runs at a time as you scroll ("Loading more pipeline runs...").
Runs Table
| Column | Description |
|---|---|
| Data Pipeline | The pipeline the run belongs to. |
| Activation | An icon for the trigger type: person for Manual, clock for Schedule, bolt for Event. Hover to see the type. |
| Start Time | When the run started. Sortable. |
| Duration | Run duration as mm:ss, or In progress. |
| Status | Completed or In progress. Sortable. |
| Success | For completed runs: Success (green), Success with warnings (amber), or Failure (red). In-progress runs show a dash. Sortable. |
| Completed Stages | Stages that have finished. |
| Failed Stages | Stages that failed. |
| Actions | Refresh run, Analyze run, and Cancel run. |
Select the refresh icon at the top right of the page to reload the whole list.
Filter Runs
The filter panel above the table has these filters:
| Filter | Options |
|---|---|
| Pipeline | Any, or a specific pipeline. |
| Activation | Any, Manual, Schedule, or Event. The page opens with Manual selected. |
| Status | Any, Completed, or In progress. |
| Success | Any, Success, or Failure. |
| Period | Any, Last 1 hour, Last 24 hours, Last 7 days, Last 30 days, or Custom range. |
Select More filters to show:
- User: Search by UPN and select a user to show only runs that user triggered.
- Custom range: From and To date and time pickers. Shown when Period is Custom range.
Active filters appear as chips below the panel (for example, "Status: Completed"). Select the x on a chip to remove that filter, or select Clear all to reset every filter to Any.
Run Actions
Refresh a Run
Select the Refresh run icon to reload a single run's status. If the run no longer matches the current filters, it is removed from the list.
Analyze a Run
Select the Analyze run (chart) icon to open the Data Pipeline Run Analysis dialog. It contains the run header (Run ID, Owned By, Triggered By, Start Time, End Time, Total Duration) and these sections:
| Section | Contents |
|---|---|
| Errors | Error messages recorded for the run. Shown only when there are errors. |
| Execution Timeline | Timeline bars for the pipeline run, each stage, and each stage's work items, with a legend: Pipeline Run, Stage (all successful), Stage (has failures), Has Warnings, and Work Item Extent. |
| Invocation Parameters | Canonical Run ID, Processor, Trigger, Triggered By, and each trigger parameter value. Each value has a copy icon. |
| Stage Metrics Analysis | Per-stage work item counts (completed, successful, warnings), duration, and a Work Items table when telemetry is available. |
Select Close to close the dialog.
Cancel a Run
The Cancel run icon is enabled only for runs that are in progress.
- Select the Cancel run icon.
- In the Cancel Pipeline Run dialog, select Cancel Run. Select Keep Running to leave the run alone.
Processing stops and the run is marked as cancelled. A notification confirms the cancellation.
Common Scenarios
Find failed runs: Set Activation to Any, set Success to Failure, and open Analyze run on a run to see its Errors and Failed Stages.
Watch active runs: Set Status to In progress and use Refresh run on the runs you care about.
Review recent activity: Set Period to Last 24 hours and Activation to Any.
Find runs you started: Under More filters, search for your UPN in User.
Troubleshooting
- A run you expected isn't listed: The page opens filtered to Manual runs. Set Activation to Any, and check the other filter chips. Viewing runs requires
dataPipelines/writeon the pipeline. With Pipeline set to Any, that permission is required at the instance scope, so a Reader role alone does not list runs. See Data Pipeline Permissions. - User search shows "Access Denied": You don't have permission to search security principals.
- No stage metrics or timeline: The run may not have started any stages yet, or telemetry isn't available for it.